Compressed air leak cost

Power (kW) = leak rate (CFM) × specific power (kW/CFM) · Annual energy (kWh) = Power × hours/yr · Annual cost ($) = Annual energy × $/kWh

This calculator ties the energy and money lost to compressed air leaks to four inputs: the total leak rate, the compressor's specific power consumption, the hours the system stays pressurized, and the electricity price. Power Required to Supply Leak Rate (kW) = Estimated Total Leak Rate (CFM) × Compressor Specific Power (kW per CFM); at 50 CFM and 0.18 kW/CFM, that is 50 × 0.18 = 9 kW — the power consumed just to feed the leaks, since every CFM that escapes still had to be compressed. Annual Energy Wasted (kWh) = Power Required to Supply Leak Rate (kW) × Operating Hours per Year; because leaks are physical openings that release pressurized air for as long as the system is pressurized, the relevant hours are the hours the air system runs (typically 8,760 for a continuously pressurized plant, not just production hours), so at 9 kW and 8,760 hours that is 78,840 kWh wasted annually. Annual Cost of Leaks ($/year) = Annual Energy Wasted (kWh) × Electricity Price ($/kWh); at 78,840 kWh and $0.10/kWh, that is $7,884 per year. The leak rate is the single most decision-relevant input: DOE and Compressed Air Challenge data commonly find that unmanaged systems lose 20-30% of total compressor output to leaks, while well-managed systems with regular ultrasonic leak surveys can hold leak rates to the single digits. Specific power varies with compressor type, age, maintenance, and system pressure — well-maintained rotary screw compressors at 100 psi typically run 0.16-0.25 kW per CFM. The model treats the leak rate as a continuous steady load and captures only the energy cost of leaks, not the additional costs of extra compressor capacity, maintenance, or moisture and contamination that leaks can introduce. Data sources: DOE Compressed Air Challenge program data; compressed air system efficiency studies from industrial energy audits; compressor-specific power consumption from manufacturer specifications and CAGI (Compressed Air and Gas Institute) data; leak rate prevalence from facility energy audits; electricity cost data from EIA industrial rates.

Open the calculator →

Industrial motor energy use

Input Power (kW) = (HP × 0.746) ÷ (efficiency ÷ 100) · Annual energy (kWh) = Input Power × hours/yr · Annual cost ($) = Annual energy × $/kWh

This calculator ties the electrical energy a motor consumes over a year to four inputs: the motor's rated horsepower, its efficiency, the hours it runs each year, and the electricity price paid. Motor Input Power (kW) = (Motor Horsepower (HP) × 0.746) ÷ (Motor Efficiency (%) ÷ 100). The 0.746 factor converts one mechanical horsepower into kilowatts, and dividing by efficiency (expressed as a decimal) accounts for the energy lost as heat inside the motor — a motor is never 100% efficient, so it always draws more electrical power than the mechanical power it delivers. At 100 HP and 90% efficiency, that is (100 × 0.746) ÷ 0.90 = 82.89 kW of electrical input power; the same motor at NEMA Premium efficiency (95.4%) draws only (100 × 0.746) ÷ 0.954 = 78.20 kW. Annual Energy Consumption (kWh) = Motor Input Power (kW) × Operating Hours per Year; energy is power sustained over time, so kilowatts × hours gives kilowatt-hours, and at 82.89 kW and 6,000 hours/year that is 82.89 × 6,000 = 497,340 kWh. Annual Energy Cost ($/year) = Annual Energy Consumption (kWh) × Electricity Price ($/kWh); at 497,340 kWh and $0.10/kWh, that is $49,734 per year. Operating hours are the single most decision-relevant input — a motor running continuously (8,760 hours/year) accumulates roughly three times the energy cost of the same motor running a single 8-hour shift five days a week. The model assumes the motor runs at its rated load and efficiency; real motors are typically most efficient in the 50-100% load range and lose efficiency significantly when lightly loaded (below about 40-50% of rated capacity), so an oversized motor running at low load can waste substantial energy. It captures only the energy cost of the motor itself — not power factor penalties, demand charges, or maintenance costs. Data sources: NEMA motor efficiency standards and classifications; motor efficiency data from manufacturer specifications and IEEE standards; industrial motor load profiles from DOE and facility energy audits; industrial electricity rates from EIA data; motor life expectancy from industry standards and maintenance records.

Open the calculator →

Power factor correction

Current reactive power (kVAR) = kW × tan(arccos(current PF)) · Target reactive power (kVAR) = kW × tan(arccos(target PF)) · Capacitor bank (kVAR) = current − target reactive · Apparent power (kVA) = kW ÷ PF · Annual savings ($) = kVA reduction × $/kVA × 12

This calculator ties the capacitor bank size needed to correct power factor and the resulting demand-charge savings to four inputs: the real power load, the current and target power factors, and the demand charge rate billed on apparent power. Current Reactive Power (kVAR) = Real Power (kW) × tan(arccos(Current Power Factor)); power factor is the ratio of real power to apparent power, and the reactive power a load draws equals the real power times the tangent of the phase angle between them (arccos of power factor). At 500 kW and a 0.75 power factor, that is 500 × 0.8819 = 440.96 kVAR. Target Reactive Power (kVAR) = Real Power (kW) × tan(arccos(Target Power Factor)); at a 0.95 target, that is 500 × 0.3287 = 164.34 kVAR. Required Capacitor Bank Size (kVAR) = Current Reactive Power − Target Reactive Power; a capacitor bank supplies reactive power locally so the utility no longer has to deliver it, so the size needed is the gap between current and target reactive demand — 440.96 − 164.34 = 276.62 kVAR. Current Apparent Power (kVA) = Real Power ÷ Current Power Factor = 500 ÷ 0.75 = 666.67 kVA; Target Apparent Power (kVA) = Real Power ÷ Target Power Factor = 500 ÷ 0.95 = 526.32 kVA; kVA Reduction = 666.67 − 526.32 = 140.35 kVA. Annual Demand Charge Savings ($/year) = kVA Reduction × Demand Charge Rate ($/kVA) × 12; utilities that bill demand on apparent power inherently penalize low power factor, so correcting it shrinks the kVA the utility must reserve and the monthly demand charge with it — at 140.35 kVA, $8/kVA, and 12 months, that is 140.35 × 8 × 12 = $13,473.68 per year. The model assumes a simple fixed capacitor bank and a steady-state load; real facilities have varying load profiles and harmonic content that can affect sizing and may require detuned or switched banks, and it captures only kVA-based demand-charge savings, not explicit power factor penalty clauses. Data sources: IEEE 1415 standard for power factor correction; utility demand charge structures from FERC and regional transmission organization tariffs; capacitor bank sizing methodology from IEEE and NEMA standards; reactive power calculations from AC circuit theory and power systems engineering; industrial power factor data from facility energy audits and utility billing analysis.

Open the calculator →

Variable Frequency Drive savings (cube law / affinity laws)

Full-Speed Power (kW) = (HP × 0.746) ÷ (efficiency ÷ 100) · Power at VFD Speed (kW) = Full-Speed Power × (speed ÷ 100)³ · Annual energy (kWh) = Power × hours/yr · Annual savings ($) = Energy savings × $/kWh

This calculator ties the energy a VFD saves on a centrifugal fan or pump to five inputs: the motor's rated horsepower, its efficiency, the hours it runs each year, the electricity price, and the average speed it will operate at once the VFD is installed. Full-Speed Power (kW) = (Motor Horsepower (HP) × 0.746) ÷ (Motor Efficiency (%) ÷ 100); the 0.746 factor converts one mechanical horsepower into kilowatts, and dividing by efficiency (as a decimal) accounts for the energy lost as heat inside the motor. At 50 HP and 92% efficiency, that is (50 × 0.746) ÷ 0.92 = 40.54 kW. Power at Average VFD Speed (kW) = Full-Speed Power (kW) × (Average Operating Speed with VFD (%) ÷ 100)³ — this is the cube law (the affinity laws of fluid mechanics), which says that for a centrifugal fan or pump the power required scales with the cube of the impeller speed, so reducing speed to 70% cuts power to 0.7³ = 0.343 of full-speed power, not 70%; at 40.54 kW and 70% speed that is 40.54 × 0.343 = 13.91 kW. Annual Energy Without VFD (kWh) = Full-Speed Power × Operating Hours = 40.54 × 6,000 = 243,240 kWh; Annual Energy With VFD (kWh) = Power at Average VFD Speed × Operating Hours = 13.91 × 6,000 = 83,460 kWh. Annual Energy Savings (kWh) = 243,240 − 83,460 = 159,780 kWh; Annual Cost Savings ($/year) = Annual Energy Savings × Electricity Price = 159,780 × $0.10 = $15,978. The crucial caveat: the cube law applies specifically to variable-torque centrifugal loads — fans, pumps, and blowers where flow is created by a rotating impeller. It does NOT apply to constant-torque loads like conveyors, positive-displacement pumps, cranes, or hoists, where torque demand stays roughly constant regardless of speed and power scales roughly linearly with speed instead of with its cube; on those loads VFD savings are much smaller, calculated differently, and may not exist at all beyond the VFD's own losses. The average operating speed is the single most decision-relevant input because power scales with the cube of speed, so even modest speed reductions produce outsized savings. The model assumes the motor was previously running at full speed with output throttled by dampers or valves (the classic VFD retrofit case) and does not subtract the VFD's own inherent losses (typically 2-5% of throughput), which slightly reduce net savings but are almost always far outweighed by the cube-law savings on variable-torque loads. Data sources: Affinity laws (cube law) from fluid mechanics and pump/fan engineering standards (ISO, ASHRAE); VFD efficiency data from manufacturer specifications and IEEE standards; industrial load profiles from DOE and facility energy audits; electricity rates from EIA industrial data; VFD payback analysis from utility rebate programs and industrial case studies.

Open the calculator →

Building energy benchmarking (EUI)

Building EUI (kBtu/sqft/yr) = Annual energy (kBtu) ÷ square footage · Performance vs. Median (%) = ((median EUI − building EUI) ÷ median EUI) × 100

This calculator ties a building's energy performance to three inputs: its floor area, its total annual site energy consumption, and a reference median EUI for its building type.

Data sources: ENERGY STAR Portfolio Manager U.S. National Median Reference values by building type; CBECS (Commercial Buildings Energy Consumption Survey) data from EIA; site vs. source energy methodology from EPA and ASHRAE standards; building energy benchmarking standards from ASHRAE 90.1 and IECC.

Read the full explanation on the calculator page →

Commercial HVAC load (rule-of-thumb sizing)

Cooling Load (Tons) = square footage ÷ sq ft per ton · Cooling Load (BTU/hr) = Tons × 12,000

This calculator estimates a commercial building's cooling load using rule-of-thumb square-feet-per-ton sizing factors tied to two inputs: the building's floor area and its building type.

Data sources: ASHRAE Fundamentals Handbook rule-of-thumb sizing guidance; Manual N (Commercial Load Calculation) methodology from ACCA; building type-specific cooling load factors from ASHRAE 90.1 and commercial HVAC design standards; typical occupancy and equipment loads by building type from commercial energy audits and design guides.

Read the full explanation on the calculator page →

Harmonic distortion (Total Harmonic Distortion, THD)

THD (%) = √(3rd (%)² + 5th (%)² + 7th (%)² + 9th (%)² + 11th (%)²) · Flag vs. 5% IEEE 519 general guideline

This calculator combines five individual harmonic magnitudes into a single Total Harmonic Distortion figure tied to five inputs: the 3rd, 5th, 7th, 9th, and 11th harmonic magnitudes, each expressed as a percentage of the fundamental (60 Hz) magnitude.

Data sources: IEEE 519-2022 standard for harmonic distortion limits; power quality measurement methodology from IEC 61000-4-7; harmonic distortion data from industrial power quality audits and VFD/UPS manufacturer specifications; transformer and motor heating loss calculations from IEEE and NEMA standards; utility interconnection requirements for harmonic mitigation.

Read the full explanation on the calculator page →

Lighting retrofit ROI (energy savings & payback)

Wattage Reduction (kW) = (existing W − LED W) × fixtures ÷ 1,000 · Annual Energy (kWh) = kW × hours/yr · Annual $ = kWh × $/kWh · Net Cost = (cost/fixture × fixtures) − (rebate/fixture × fixtures) · Payback (yr) = Net Cost ÷ Annual $

This calculator ties the energy savings, project cost, and payback period of a commercial LED lighting retrofit to seven inputs: the number of fixtures, the existing fixture wattage, the LED replacement wattage, the annual operating hours, the electricity price, the installed cost per fixture, and the available utility rebate per fixture. Wattage Reduction per Fixture (W) = Existing Fixture Wattage (W) − LED Replacement Wattage (W); LEDs convert a much higher share of input electricity directly into usable light rather than heat, so replacing a 400W metal halide high-bay with a 150W LED equivalent cuts 250W per fixture. Total Wattage Reduction (kW) = (Wattage Reduction per Fixture (W) × Number of Fixtures) ÷ 1,000; at 250W across 200 fixtures that is (250 × 200) ÷ 1,000 = 50 kW. Annual Energy Savings (kWh) = Total Wattage Reduction (kW) × Operating Hours per Year; at 50 kW and 4,000 hours that is 200,000 kWh. Annual Cost Savings ($/year) = Annual Energy Savings (kWh) × Electricity Price ($/kWh); at 200,000 kWh and $0.12/kWh that is $24,000. Net Project Cost ($) = (Cost per Fixture (Installed) × Number of Fixtures) − (Available Rebate per Fixture × Number of Fixtures); at $150 and $30 per fixture across 200 fixtures that is $30,000 − $6,000 = $24,000. Simple Payback Period (years) = Net Project Cost ($) ÷ Annual Cost Savings ($/year); at $24,000 net cost and $24,000/year savings that is 1.0 year. The model captures energy cost savings and payback from project cost alone — it does not account for maintenance savings from LEDs lasting 3-5x longer than the metal halide or fluorescent technology they replace, which reduces relamping labor and material costs and is an additional benefit on top of the energy savings shown. Data sources: LED vs. metal halide/fluorescent wattage comparisons from manufacturer specifications and DOE lighting efficiency data; commercial lighting retrofit payback analysis from utility rebate programs and energy audit case studies; LED fixture lifespan data from manufacturer specifications and IESNA standards; electricity rates from EIA commercial/industrial data.

Open the calculator →

← All calculation methods