Calculation methods

Geothermal Calculation Methods

Formulas and assumptions behind our geothermal output, drilling cost, LCOE, and heat pump calculators.

Geothermal capacity factor & output

Annual Energy Output (MWh/year) = plant capacity (MW) × 8,760 × (capacity factor (%) ÷ 100) · Equivalent Homes Powered (homes) = (annual energy output (MWh/year) × 1,000) ÷ 10,800

This calculator estimates the annual energy output of a geothermal power plant and the number of average U.S. homes that output could power, by applying a capacity factor to the plant's nameplate capacity across a full year, then converting the resulting energy into an equivalent household count.

Data sources: geothermal capacity factor ranges (85-95%+) from DOE (Department of Energy), NREL (National Renewable Energy Laboratory), and EIA (U.S. Energy Information Administration) geothermal plant performance data; U.S. wind fleet capacity factor averages (~33-36%) and utility solar capacity factor averages (~24%) from EIA electric power monthly and annual reports; U.S. residential average household electricity consumption (~10,800 kWh/year) from EIA Residential Energy Consumption Survey (RECS).

Read the full explanation on the calculator page →

EGS well cost (risk-adjusted)

Wells Required Accounting for Success Rate (wells) = number of successful wells needed ÷ (well success rate (%) ÷ 100) · Total Drilling Program Cost ($) = wells required accounting for success rate × drilling cost per well ($)

This calculator estimates the total drilling program cost for an Enhanced Geothermal System (EGS) production well campaign by first inflating the number of successful wells needed to account for wells that turn out to be dry or underperforming, then multiplying that risk-adjusted well count by the drilling cost per well.

Data sources: EGS horizontal well drilling cost reductions ($9.4M to $4.8M per well) from Fervo Energy's Cape Station project public reporting; geothermal drilling dry-hole / success rate benchmarks (~20% dry-hole rate) from DOE (Department of Energy) and geothermal drilling studies; EGS drilling and subsurface characterization methodology from DOE Geothermal Technologies Office and National Renewable Energy Laboratory (NREL) technical reports.

Read the full explanation on the calculator page →

Geothermal LCOE (levelized cost of electricity)

Total Overnight Capital Cost ($) = plant capacity (MW) × 1,000 × overnight capital cost ($/kW) · Capital Recovery Factor = (r × (1+r)^n) ÷ ((1+r)^n - 1) · LCOE ($/MWh) = (annualized capital cost + annual O&M cost) ÷ annual generation (MWh/year)

This calculator estimates the levelized cost of electricity (LCOE) for an Enhanced Geothermal System (EGS) geothermal project using a capital-recovery-factor annualization model, which converts the plant's overnight capital cost into a fixed annual capital charge, adds annual operating cost, and divides by annual generation to produce a single $/MWh figure.

Data sources: EGS capital cost trajectories ($28,000/kW in 2021 to $5,000-6,000/kW currently, $3,700/kW by 2035 DOE target) and EGS LCOE ranges ($65-140/MWh) from U.S. Department of Energy Geothermal Technologies Office and National Renewable Energy Laboratory (NREL) technical reports and Fervo Energy Cape Station project public reporting; capital recovery factor methodology from standard engineering economics.

Read the full explanation on the calculator page →

Geothermal power plant output

Gross Plant Capacity (MW) = number of production wells × average output per well (MW) · Annual Energy Output (MWh/year) = gross plant capacity (MW) × 8,760 × (plant capacity factor (%) ÷ 100)

This calculator sizes a geothermal power plant from the wellfield up by first multiplying the number of production wells by the average electrical output per well to get gross plant capacity, then applying a capacity factor across a full year to report annual energy output.

Data sources: EGS per-well productivity (10+ MW/well at Fervo Energy's Cape Station project) and Cape Station 400 MW by 2028 target from Fervo Energy public reporting and Southern California Edison power purchase agreement disclosures; conventional geothermal per-well productivity (3-5 MW/well) and geothermal capacity factor ranges (85-95%+) from DOE (Department of Energy), NREL (National Renewable Energy Laboratory), and EIA (U.S. Energy Information Administration) geothermal plant performance data.

Read the full explanation on the calculator page →

Data center co-location with geothermal

Annual Geothermal Output (MWh/year) = geothermal plant capacity (MW) × 8760 × (capacity factor (%) ÷ 100) · Annual Data Center Demand (MWh/year) = target data center continuous load (MW) × 8760 · Coverage (%) = (annual geothermal output ÷ annual data center demand) × 100 · Energy Surplus or Gap (MWh/year) = annual geothermal output − annual data center demand · Max Supportable Continuous Data Center Load (MW) = annual geothermal output (MWh/year) ÷ 8760

This calculator compares a geothermal plant's real annual energy output against a data center's annual energy demand, then derives the coverage percentage, the energy surplus or gap, and the maximum continuous load the plant can support.

Data sources: Geothermal capacity factor ranges (85-95%+) from DOE (Department of Energy), NREL (National Renewable Energy Laboratory), and EIA (U.S. Energy Information Administration) geothermal plant performance data; Google-Fervo Energy enhanced geothermal agreement from company announcements and DOE documentation; Fervo Energy Cape Station project 373 MW Southern California Edison offtake agreement and 500 MW total capacity target from Fervo Energy public reporting and utility disclosures; data center power demand profiles from industry technical documentation and hyperscaler announcements; data center backup power requirements from industry standards and technical guidelines.

Read the full explanation on the calculator page →

Geothermal direct-use heating

Thermal Output (MMBtu/hr) = (geothermal fluid flow rate (gpm) × 500 × temperature drop across heat exchanger (°F)) ÷ 1,000,000 · Annual Thermal Energy Delivered (MMBtu/year) = thermal output (MMBtu/hr) × annual operating hours

This calculator estimates the thermal output and annual thermal energy delivered by a direct-use geothermal heating system from the geothermal fluid flow rate, the temperature drop across the heat exchanger, and the annual operating hours.

Data sources: Water-side heat-transfer constant (500 BTU/hr per gpm per °F) from standard HVAC and district heating engineering references (ASHRAE Handbook); direct-use geothermal application categories and resource temperature ranges from U.S. Department of Energy Geothermal Technologies Office and Oregon Institute of Technology Geo-Heat Center technical literature; U.S. direct-use geothermal deployment (Boise, Idaho district heating and western U.S. applications) from DOE and state geothermal resource assessments.

Read the full explanation on the calculator page →

Geothermal drilling risk-adjusted cost

Risk-Adjusted Cost per Well ($) = cost per well ($) ÷ (well success rate (%) ÷ 100) · Risk-Adjusted Cost per MW ($/MW) = risk-adjusted cost per well ($) ÷ expected output per successful well (MW)

This calculator produces a risk-adjusted cost-per-MW metric for comparing prospective geothermal sites or projects at different exploration confidence levels.

Data sources: EGS well drilling cost ($4.8M/well at Fervo Energy's Cape Station project) from Fervo Energy public reporting; modern EGS per-well productivity (10+ MW/well) and conventional geothermal per-well productivity (3-5 MW/well) from DOE (Department of Energy), NREL (National Renewable Energy Laboratory), and EIA (U.S. Energy Information Administration) geothermal performance data; representative well success rates by exploration stage from DOE Geothermal Technologies Office and industry geothermal exploration risk literature.

Read the full explanation on the calculator page →

Geothermal heat pump sizing

Required Heat Pump Capacity (tons) = building heating/cooling load (BTU/hr) ÷ 12,000 · Required Ground Loop Length (feet) = required heat pump capacity (tons) × ground loop length per ton (ft/ton)

This calculator sizes a residential geothermal (ground-source) heat pump system from the building heating/cooling load and a ground loop length per ton, producing the required heat pump capacity in tons and the required ground loop length in feet.

Data sources: Heat pump capacity unit definition (1 ton = 12,000 BTU/hr) from standard HVAC engineering references (ASHRAE Handbook); vertical closed-loop ground loop length ranges (150-300 ft/ton) and soil thermal conductivity variation from International Ground Source Heat Pump Association (IGSHPA) and DOE (Department of Energy) geothermal heat pump design guidelines; residential building load ranges from ACCA Manual J methodology and DOE residential building energy analysis.

Read the full explanation on the calculator page →