Capacity Cost Pass-Through Calculator
In capacity markets like PJM, large loads pay for their share of the system's capacity requirement through a capacity tag — typically set by their load during the grid's peak hours of the prior year. Utilities pass the auction clearing price through to customers on that tag, so when capacity prices jump, bills jump with them. This calculator turns peak load contribution, an obligation multiplier, the current and prior capacity prices, and a peak-reduction target into the annual capacity cost, its cost per MWh and per kW-month, the increase versus the prior price, and the dollars saved by curtailing or shifting load during peak hours.
Your load during the grid's peak hours that sets your capacity tag.
Zonal scaling factor times reserve factor; close to 1.0 in recent PJM auctions. Check your utility.
PJM's 2028/2029 auction cleared at the $325/MW-day cap. Use your market's price.
PJM's 2024/2025 auction price, before the recent jump.
obligation (MW) × capacity price ($/MW-day) × 365
annual capacity cost ÷ annual energy use
annual capacity cost ÷ (obligation × 1,000) ÷ 12
annual capacity cost ÷ cost at prior price
annual capacity cost × peak reduction (%)
Results update live as you type. For planning and field-check estimates — always verify against applicable standards and equipment ratings.
How we calculate this →For a 100 MW data center, PJM's current $325/MW-day capacity price is about $11.9 million a year, or roughly $16 per MWh, compared with about $1.1 million at the 2024/2025 price. Because the tag depends on your load during a handful of peak hours, curtailing or shifting just 10% of it then is worth about $1.2 million a year.
How capacity cost pass-through is calculated
In organized capacity markets, large loads pay for their share of the system's capacity requirement through a capacity tag — the megawatts they are obligated to support, typically set by their load during the grid's peak hours of the prior delivery year. Utilities pass the auction clearing price through to customers on that tag, so when capacity prices rise, bills rise with them. Seven quantities tie the calculation together.
Capacity Obligation (MW) = Peak Load Contribution (MW) × Obligation Multiplier. The peak load contribution is the load during the system's peak-setting hours; the obligation multiplier is a zonal scaling factor times a reserve factor that converts peak load into a capacity obligation — it has been close to 1.0 in recent PJM auctions, but check your utility's tariff. At 100 MW peak load and a 1.00 multiplier, the obligation is 100 MW.
Annual Capacity Cost ($) = Capacity Obligation (MW) × Capacity Price ($/MW-day) × 365. The capacity price is the auction clearing price paid per MW of capacity per day; PJM's 2028/2029 auction cleared at the $325/MW-day cap, while the 2024/2025 auction cleared at just $28.92/MW-day. At 100 MW and $325/MW-day, the annual capacity cost is about $11.86 million.
Annual Energy Use (MWh) = Peak Load Contribution (MW) × 8,760 × Load Factor (%) ÷ 100. The load factor converts peak load into annual energy consumption; a data center running at an 85% load factor consumes 744,600 MWh a year at 100 MW peak. Capacity Cost per MWh ($/MWh) = Annual Capacity Cost ÷ Annual Energy Use — about $15.93/MWh at the defaults, the capacity charge expressed as an energy adder. Capacity Cost per kW-month ($/kW-mo) = Annual Capacity Cost ÷ (Capacity Obligation (MW) × 1,000) ÷ 12, normalizing the annual cost against the obligated kilowatts across 12 months — about $9.89/kW-month at the defaults.
Increase vs Prior Price (×) = Annual Capacity Cost ÷ Cost at Prior Price, where Cost at Prior Price ($) = Capacity Obligation × Prior Capacity Price × 365. At $325/MW-day versus the $28.92/MW-day 2024/2025 price, capacity cost is about 11.2 times higher — the magnitude of the bill shock large loads experienced when the recent auction cleared. Savings from Peak Reduction ($) = Annual Capacity Cost × Peak Reduction (%) ÷ 100; because the tag is set by load during a handful of peak hours, curtailing or shifting just 10% of it then is worth about $1.19 million a year at the defaults. Data sources: PJM 2028/2029 Base Residual Auction clearing price ($325/MW-day cap); PJM 2024/2025 Base Residual Auction clearing price ($28.92/MW-day); PJM capacity obligation (CPR/ICAP) tag-setting methodology; utility capacity cost pass-through tariff practice.
Frequently asked questions
Why is my bill higher?
Capacity auction prices rose sharply, and utilities pass them to customers.
What sets my capacity tag?
Typically your load during the system's peak hours of the prior year.
How can large loads cut this cost?
By reducing or shifting load during peaks, or with on-site generation or storage.
Is this PJM only?
The inputs are PJM-style; other markets use similar tag-based charges.