Hosting vs Self-Hosting Cost Comparison
Compare the two ways to run Bitcoin miners — paying an all-in hosting rate versus building and operating your own site. This calculator puts both options on the same revenue base (your miners, today's network conditions) and prices each side honestly: hosting is a single $/kWh, while self-hosting folds in energy, PUE overhead, fixed demand charges, O&M and labor, and infrastructure capex amortized over its life. The cheaper option per day, month, and year is highlighted — but the result depends entirely on the inputs you enter.
Turnkey $/kWh covering power, cooling, space, and security.
Demand charges, capacity, interconnection.
Building, electrical, cooling build-out.
Self-hosting cost defaults are illustrative placeholders — enter your own quotes. Hosting and self-hosting share the same miner and network inputs above, so the only thing that varies between the two options is how the power is priced.
your share of 144 blocks
miner draw × 24 × uptime
as entered
energy + PUE + fixed + O&M + capex
revenue − hosting cost
revenue − self-hosting cost
1000 kW × 8760 × uptime × rate
at self-hosted all-in rate
self-hosting = hosting at this rate
Hosting vs self-hosting
Hosting wins on net/day| Metric | Hosting | Self-hosting |
|---|---|---|
| Cost / day | $6.58 | $7.28 |
| Net / day | $5.45 | $4.75 |
| Net / month | $165.69 | $144.48 |
| Net / year | $1,989 | $1,735 |
| Annual cost / MW | $686,784 | $759,593 |
Result depends entirely on your inputs — hosting rates, energy prices, PUE, fixed charges, O&M, and capex all vary widely by site and contract. Enter your own quotes before relying on these numbers. Defaults reflect October 2026 network conditions; update BTC price, hashrate and fees before relying on results.
Results update live as you type. For planning and field-check estimates — always verify against applicable standards and equipment ratings.
How we calculate this →How hosting and self-hosting costs are compared
This calculator holds the mining economics constant and varies only how the power is priced. Revenue is identical for both options: revenue/day (after pool fee) = (TH/s × 1e12 ÷ (network EH/s × 1e18)) × 144 × subsidy × (1 + fee%) × uptime × quantity × BTC price × (1 − pool fee%). Energy/day = (W ÷ 1000) × 24 × uptime × quantity. The two options then diverge on cost.
Hosting is a single all-in $/kWh — the turnkey rate a hosting operator charges covering power, cooling, space, security, and often the staff to keep the miners running. Hosting cost/day = kWh/day × hosting rate. Self-hosting is more complex, because the operator pays for energy, cooling overhead, fixed demand charges, labor, and the building itself. Self-hosted all-in $/kWh = energy price × PUE + (fixed + O&M) × 12 ÷ (8760 × uptime) + (capex per kW ÷ life years) ÷ (8760 × uptime). The first term is the energy actually drawn from the grid (miner energy scaled by PUE to capture cooling and power-delivery overhead); the second annualizes the per-kW-month fixed and O&M charges across the hours the miners actually run; the third straight-line-amortizes the infrastructure capex over its life, again per kWh of actual runtime. Self-hosting cost/day = kWh/day × self-hosted all-in rate.
Net/day for each option = revenue/day (after pool fee) − cost/day, with monthly (×30.4) and annual (×365) projections. Annual cost per MW of miner load = 1000 kW × 8760 × uptime × $/kWh for each option — a site-level figure that strips out miner count and lets you compare the two pricing models on equal footing regardless of fleet size. The breakeven self-hosting energy price solves for the energy price at which self-hosting all-in equals the hosting rate: breakeven = (hosting rate − fixed and O&M and capex components per kWh) ÷ PUE. Below that energy price, self-hosting beats hosting; above it, hosting wins.
The side-by-side table highlights the option with the higher net/day, but the winner is entirely input-driven. A cheap hosting rate beats an expensive self-build, and a cheap-energy self-build with low fixed charges beats a premium hosting contract — which is why the defaults are placeholders and the result depends entirely on the quotes you enter.
Frequently asked questions
What does hosting include?
A Bitcoin mining hosting contract is typically quoted as a single all-in $/kWh rate that covers the electricity, cooling, facility space, physical security, and often the on-site staff to keep the miners running and swap failed hardware. The host owns and operates the building, the electrical and cooling infrastructure, and the internet connection; you own just the ASICs and pay the all-in rate for every kilowatt-hour they draw. It is the simplest way to mine — no build-out, no staff, no demand charges — but the all-in rate is higher per kWh than raw energy because it bundles all of those services and the host's margin.
When does self-hosting make sense?
Self-hosting wins when you can secure energy below the breakeven self-hosting energy price this calculator computes — the rate at which your all-in self-hosting cost (energy plus PUE overhead, fixed demand charges, O&M and labor, and amortized infrastructure capex) equals the hosting rate. That usually means access to cheap stranded or industrial power, the scale to spread fixed charges and capex across a large fleet, and the operational capacity to run the site yourself. Below the breakeven energy price, self-hosting earns more per day; above it, hosting is cheaper despite its higher per-kWh rate, because you avoid the fixed costs and capital the host would otherwise absorb.
What hidden costs do hosting contracts have?
The headline $/kWh is rarely the full story. Common additions include deployment or installation fees per miner, minimum-term commitments that lock you in even if hashprice collapses, uptime or availability guarantees that are weaker than they sound (a host can hit 98% facility uptime while your miners sit offline waiting for parts), repair and RMA fees for failed hardware, bandwidth or networking charges, and profit-share or pool-fee arrangements on top of the stated rate. Some contracts also pass through demand charges or time-of-use energy escalators, so the effective rate rises in peak hours. Read the contract for what the all-in rate actually covers before comparing it to a self-hosting build.
How does PUE affect my cost?
PUE (Power Usage Effectiveness) multiplies the raw energy price in the self-hosting all-in rate: the term is energy price × PUE, because the grid must deliver not just the miner draw but also the cooling, UPS losses, and building systems that keep the site running. A PUE of 1.10 means the facility draws 10% more energy than the miners alone, all of it billed to you. Lowering PUE — through immersion or hydro-cooling — directly lowers the self-hosted all-in $/kWh, which is why cooling architecture is a cost decision at scale, not just an engineering one. Hosting contracts fold PUE into the all-in rate, so a host with a lower-PUE facility can offer a more competitive $/kWh.