Calculation methods

Natural Gas & Behind-the-Meter Power Calculation Methods

Formulas and assumptions behind our heat rate, fuel cost, and behind-the-meter gas generation calculators.

Heat rate & fuel cost

Fuel use (MMBtu/MWh) = heat rate (Btu/kWh) ÷ 1000 · Fuel cost ($/MWh) = fuel use × gas price · Efficiency (%) = 3412 ÷ heat rate × 100 · Annual fuel use = capacity × 8760 × CF × fuel use

Heat rate is the fuel energy (Btu) a plant burns to produce one kWh of electricity. Dividing by 1,000 converts it to MMBtu per MWh — the unit natural gas is sold in — so multiplying by the delivered gas price ($/MMBtu) gives fuel cost per MWh directly. Thermal efficiency is the inverse: 3,412 Btu/kWh is the energy content of one kWh, so efficiency (%) = 3,412 ÷ heat rate × 100. US gas is priced on higher heating value (HHV), so HHV heat rates match how fuel is billed; LHV figures look about 10% better because they exclude the latent heat of water vapor in the exhaust. Annual fuel use scales the per-MWh figure by generation (capacity × 8,760 × capacity factor). This covers fuel only — capital, O&M, and full project economics belong in a levelized cost model.

Used by: Heat Rate & Fuel Cost per MWh Calculator

Pipeline gas supply requirement

Peak gas demand (MMBtu/hr) = capacity (MW) × heat rate (Btu/kWh) ÷ 1000 · Daily gas demand = peak × 24 · Daily volume (MMcf/day) = daily demand ÷ heating value (Btu/scf) · Annual volume (Bcf) = capacity × 8760 × CF × heat rate ÷ 1000 ÷ heating value ÷ 1000 · Share of pipeline (%) = daily volume ÷ pipeline capacity × 100

Gas is sold by energy (MMBtu) but pipelines move volume (cubic feet), so the bridge between a power plant and a pipeline is the gas heating value in Btu per standard cubic foot (Btu/scf). Peak gas demand (MMBtu/hr) = plant capacity (MW) × heat rate (Btu/kWh) ÷ 1,000 — the 1,000 converts Btu to MMBtu and kW to MW in one step. Daily gas demand is peak × 24, and daily gas volume (MMcf/day) = daily demand ÷ heating value. Annual gas volume (Bcf) scales by capacity factor and 8,760 hours, then divides by heating value and 1,000 to convert MMcf to Bcf. The share of pipeline capacity compares daily volume against a reference interstate pipeline — 1,000 MMcf/day is a large line, and a single 200 MW plant at 8,500 Btu/kWh takes roughly 4% of it, which is why firm transportation contracts and interconnect timing are often the real constraint on behind-the-meter power. This covers pipeline gas only — laterals, compression, and backup fuel are site-specific extras. Data sources: pipeline-quality natural gas heating value typically 1,020–1,050 Btu/scf; large interstate pipelines move roughly 1,000–2,000+ MMcf/day. Verification: 200 MW, 8,500 Btu/kWh, 90% CF, 1,030 Btu/scf, 1,000 MMcf/day pipeline → peak = 1,700 MMBtu/hr, daily demand = 40,800 MMBtu/day, daily volume = 39.6 MMcf/day, annual volume = 13.01 Bcf, share of pipeline = 4.0%.

Used by: Pipeline Gas Supply Requirement Calculator

Behind-the-meter gas plant LCOE

CRF = r × (1+r)ⁿ ÷ ((1+r)ⁿ − 1) · Annual capital ($) = capacity (MW) × 1000 × installed cost ($/kW) × CRF · Annual fixed O&M ($) = capacity × 1000 × fixed O&M ($/kW-yr) · Annual generation (MWh) = capacity × 8760 × CF · Fuel cost ($/MWh) = heat rate ÷ 1000 × gas price · LCOE ($/MWh) = (annual capital + annual fixed O&M) ÷ generation + fuel + variable O&M · Annual savings vs grid ($) = (grid price − LCOE) × generation

Levelized cost of energy (LCOE) is the average cost per MWh over a plant's life, combining capital recovery, fixed and variable O&M, and fuel. The capital recovery factor (CRF) converts an upfront installed cost into an equal annual payment: CRF = r × (1+r)ⁿ ÷ ((1+r)ⁿ − 1), where r is the weighted average cost of capital (WACC) and n is plant life in years. Annual capital cost = capacity (MW) × 1,000 × installed cost ($/kW) × CRF; annual fixed O&M = capacity × 1,000 × fixed O&M ($/kW-yr); and annual generation = capacity × 8,760 × capacity factor. Dividing annual capital and fixed O&M by annual generation gives their per-MWh contributions. Fuel cost per MWh = heat rate (Btu/kWh) ÷ 1,000 × gas price ($/MMBtu), using HHV heat rates to match how US gas is billed. LCOE = capital/MWh + fixed O&M/MWh + fuel/MWh + variable O&M/MWh. Annual savings versus the grid = (grid price − LCOE) × annual generation — positive when self-generation is cheaper, negative when the grid wins. The model holds fuel price, capacity factor and WACC flat over the plant life and excludes redundancy (N+1 spares), backup fuel, emissions permits, and financing/tax effects. Data sources: typical installed costs $1,500–2,000/kW simple-cycle or engines, $2,200–2,800/kW combined-cycle; BloombergNEF reports combined-cycle lead times of about five years and costs up 49% versus 2023. Verification: 100 MW, $2,000/kW, $25/kW-yr fixed O&M, $5/MWh variable O&M, 8,500 Btu/kWh, $4/MMBtu gas, 90% CF, 8% WACC, 25-year life, $80/MWh grid → CRF = 0.0937, annual capital = $18.74M, annual fixed O&M = $2.5M, generation = 788,400 MWh, fuel = $34/MWh, capital/MWh = $23.77, fixed O&M/MWh = $3.17, LCOE = $65.94/MWh, annual savings vs grid = $11.09M.

Used by: Behind-the-Meter Gas Plant LCOE Calculator

Turbine delay cost

Revenue deferred / month ($) = load (MW) × revenue per MW-year ÷ 12 · Total revenue at risk = revenue deferred / month × delay (months) · Margin at risk = total revenue at risk × operating margin · Energy needed (MWh) = load × 8760 × load factor × delay ÷ 12 · Bridge power premium ($) = energy × (bridge cost − permanent cost) · Net benefit = margin at risk − bridge premium · Break-even bridge cost ($/MWh) = permanent cost + margin at risk ÷ energy

When permanent power is delayed, the cost is the revenue the data center cannot earn while it waits. Revenue deferred per month = load (MW) × revenue per MW-year ÷ 12, so a 100 MW facility earning $10 million per MW annually defers about $83.3 million every month. Total revenue at risk scales that by the delay in months, and margin at risk applies the operating margin to convert revenue into the profit actually on the line: at a 30% margin, a 36-month delay puts $900 million of margin at risk. Bridge power — mobile turbines or engines brought in temporarily — costs more per MWh than permanent generation, but it lets the facility earn while it waits. Energy needed during the delay = load × 8,760 × load factor × (delay ÷ 12), and the bridge power premium = that energy × (bridge cost − permanent cost). At the defaults, 2.37 million MWh of bridge energy at a $64/MWh premium costs about $151 million — a fraction of the $900 million margin at risk, so the net benefit of bridging is roughly $749 million. The break-even bridge cost is the price at which bridging stops paying: permanent cost + margin at risk ÷ energy needed, about $446/MWh at the defaults. The model is illustrative — it holds revenue, margin and load factor flat and excludes permitting lead times, fuel logistics for the bridge units, and the cost of the permanent plant itself. Data sources: GE Vernova reported a 116 GW gas equipment backlog in Q2 2026 with delivery slots stretching toward 2031; analysts estimate operating data centers can generate roughly $10–12 million per MW annually. Verification: 100 MW, 36-month delay, $10M/MW-yr revenue, 30% margin, 90% load factor, $130/MWh bridge, $66/MWh permanent → revenue deferred/month = $83.33M, total revenue at risk = $3.0B, margin at risk = $900M, energy = 2,365,200 MWh, bridge premium = $151.37M, net benefit = $748.63M, break-even bridge cost = $446.50/MWh.

Used by: Turbine Delay Cost Calculator

Gas turbine vs. reciprocating engine sizing

Units for load (N) = ROUNDUP(required load (MW) ÷ unit size (MW)) · Total units = N + spare units · Installed capacity (MW) = total units × unit size · Installed cost ($) = installed capacity × 1000 × installed cost ($/kW) · Operating heat rate = base heat rate × (1 + part-load penalty ÷ 100) · Fuel cost ($/MWh) = operating heat rate ÷ 1000 × gas price ($/MMBtu) · Annual fuel cost ($) = required load × 8760 × CF ÷ 100 × fuel cost · Differences = engine value − turbine value

A behind-the-meter gas plant serves a firm load with redundancy: enough units to cover the load plus one spare (N+1) so a single failure does not drop load. Units for load = ROUNDUP(required load ÷ unit size) — round up because a partial unit cannot be built — and total units adds the spare. Installed capacity = total units × unit size, which is why smaller units size closer to the load: at 100 MW, two 50 MW turbines plus a spare give 150 MW installed, while six 18 MW engines plus a spare give 126 MW. Capital cost scales installed capacity: installed cost ($) = installed capacity (MW) × 1,000 × installed cost ($/kW). Heat rate sets fuel cost: operating heat rate = base heat rate × (1 + part-load penalty ÷ 100), and fuel cost ($/MWh) = operating heat rate ÷ 1,000 × gas price. Annual fuel cost = required load × 8,760 × capacity factor × fuel cost. The differences (engines minus turbines) make the trade-off explicit: a negative capex difference means engines cost less to build, and a negative annual fuel difference means engines burn less. Turbines win on footprint and, at larger scale, on unit count and maintenance labor. The model excludes emissions controls, air permits, maintenance intervals, and startup characteristics. Data sources: typical installed costs $1,700/kW reciprocating engines, $1,900/kW simple-cycle gas turbines; base heat rates ~8,300 Btu/kWh engines, ~9,500 Btu/kWh simple-cycle turbines; turbines penalize part load more than engines. Verification: 100 MW load, 1 spare, $4/MMBtu gas, 90% CF → turbine: 3 units, 150 MW, $285M, 10,070 Btu/kWh operating, $40.28/MWh, $31.76M/yr fuel; engine: 7 units, 126 MW, $214.2M, 8,466 Btu/kWh operating, $33.86/MWh, $26.70M/yr fuel; capex difference −$70.8M, annual fuel difference −$5.06M.

Used by: Gas Turbine vs. Reciprocating Engine Sizing Calculator

Flare gas-to-power

Gas Energy (MMBtu/day) = flare volume (Mcf/day) × 1000 × heating value (Btu/scf) ÷ 1,000,000 · Power Capacity (MW) = gas energy × 1,000,000 ÷ 24 ÷ heat rate (Btu/kWh) ÷ 1000 · Annual Generation (MWh) = capacity × 8760 × availability · Net Benefit ($) = generation × power value − generation × O&M − annual gas used × gas cost · Capital Cost ($) = capacity × 1000 × installed cost ($/kW) · Payback (yr) = capital ÷ net benefit · Gas Diverted (MMcf/yr) = volume × 365 × availability ÷ 1000

Flare gas is natural gas burned off at oil wells or facilities because there is no pipeline or market for it — wasted energy and needless CO2. Converting it to on-site power turns that waste into electricity. Gas Energy (MMBtu/day) = flare gas volume (Mcf/day) × 1,000 (scf per Mcf) × heating value (Btu/scf) ÷ 1,000,000; at 1,000 Mcf/day and 1,200 Btu/scf that is 1,200 MMBtu/day. Power Capacity (MW) = gas energy × 1,000,000 ÷ 24 ÷ heat rate (Btu/kWh) ÷ 1,000 — the 1,000,000 converts MMBtu back to Btu, 24 spreads it across the day, heat rate converts Btu to kWh, and 1,000 converts kW to MW; at 9,500 Btu/kWh, 1,200 MMBtu/day yields about 5.26 MW. Annual Generation (MWh) = capacity × 8,760 × availability, where availability is the share of hours the generator actually runs (typically 90–95% for well-maintained reciprocating engines). Annual Net Benefit ($) = annual generation × power value − annual generation × O&M rate − annual gas used (MMBtu) × gas cost; the gas cost line applies only when the flare gas has a price, and it is often free or near-free. Capital Cost ($) = power capacity × 1,000 × installed cost ($/kW), and Simple Payback (years) = capital cost ÷ annual net benefit. Gas Diverted from Flaring (MMcf/yr) = flare volume × 365 × availability ÷ 1,000 — the volume no longer burned off. Rich associated gas (1,200–1,400 Btu/scf) carries more energy per cubic foot than pipeline gas (~1,030 Btu/scf), but heavy hydrocarbons and H2S can derate engines and add gas-conditioning cost. Data sources: associated gas heating values typically 1,200–1,400 Btu/scf versus ~1,030 Btu/scf pipeline gas; reciprocating engine heat rates ~8,000–9,500 Btu/kWh; engine availability typically 90–95%. Verification: 1,000 Mcf/day, 1,200 Btu/scf, 9,500 Btu/kWh, 92% availability, $60/MWh, $0/MMBtu gas, $1,500/kW, $15/MWh O&M → gas energy = 1,200 MMBtu/day, capacity = 5.26 MW, generation = 42,397 MWh, net benefit = $1.91M, capital = $7.89M, payback = 4.1 years, gas diverted = 335.8 MMcf/yr.

Used by: Flare Gas-to-Power Calculator

CHP efficiency & savings

Fuel Input (MMBtu/hr) = electrical output (kW) × 3412 ÷ electrical eff (%) × 100 ÷ 1,000,000 · Useful Heat (MMBtu/hr) = fuel input × thermal eff (%) ÷ 100 · Total System Efficiency (%) = electrical eff + thermal eff · Annual Electricity (kWh) = electrical output × operating hours · Avoided Electricity ($) = annual electricity × grid price · Avoided Boiler Fuel ($) = useful heat ÷ boiler eff × 100 × hours × gas price · CHP Fuel ($) = fuel input × hours × gas price · CHP O&M ($) = annual electricity × O&M ($/kWh) · Net Savings ($) = avoided electricity + avoided boiler fuel − CHP fuel − CHP O&M · Payback (yr) = (electrical output × installed cost) ÷ net savings

Combined heat and power (CHP) — also called cogeneration — burns one fuel to produce electricity and useful heat from the same unit, instead of buying grid power and firing a separate boiler. Fuel Input (MMBtu/hr) = Electrical Output (kW) × 3,412 ÷ Electrical Efficiency (%) × 100 ÷ 1,000,000; the 3,412 converts kW to Btu/hr, dividing by electrical efficiency as a fraction gives the fuel energy needed, and ÷1,000,000 converts Btu to MMBtu. At 1,000 kW and 35% electrical efficiency that is about 9.75 MMBtu/hr of gas. Useful Heat Recovered (MMBtu/hr) = Fuel Input × Thermal Efficiency ÷ 100 — the share of fuel energy captured as hot water or steam rather than lost up the stack — and Total System Efficiency (%) = Electrical Efficiency + Thermal Efficiency, so a 35% electrical / 42% thermal CHP reaches 77% total efficiency versus ~35% for power-only. The savings side adds two avoided costs: Avoided Electricity Purchases ($) = Annual Electricity (kWh) × Grid Price, and Avoided Boiler Fuel ($) = Useful Heat ÷ Boiler Efficiency × 100 × Operating Hours × Gas Price — the gas a separate boiler would have burned to make the same heat, adjusted for boiler losses. Against those sit Annual CHP Fuel Cost ($) = Fuel Input × Operating Hours × Gas Price and Annual CHP O&M ($) = Annual Electricity × O&M ($/kWh). Net Annual Savings ($) = Avoided Electricity + Avoided Boiler Fuel − CHP Fuel − CHP O&M. Capital Cost ($) = Electrical Output × Installed Cost ($/kW), and Simple Payback (years) = Capital Cost ÷ Net Annual Savings. The model holds efficiencies, prices and hours flat and excludes incentives, standby charges, interconnection, and the cost of unused heat — savings depend on actually using the recovered heat, which is why CHP pays best at hospitals, food plants and campuses with steady thermal load. Data sources: US CHP installations typically 30–40% electrical efficiency and 40–50% thermal efficiency on natural gas (HHV), reaching 75–80% total efficiency; installed costs roughly $2,000–3,000/kW for reciprocating-engine CHP; boiler efficiencies 75–90%. Verification: 1,000 kW, 35% electrical, 42% thermal, 8,000 hours, $4/MMBtu gas, $0.12/kWh grid, 80% boiler, $0.015/kWh O&M, $2,500/kW → fuel input = 9.75 MMBtu/hr, useful heat = 4.09 MMBtu/hr, total efficiency = 77%, net annual savings ≈ $691,800, capital cost = $2.5M, payback ≈ 3.6 years.

Used by: CHP Efficiency & Savings Calculator

Gas price sensitivity

Annual Generation (MWh) = capacity (MW) × 8760 × CF ÷ 100 · Fuel Use (MMBtu/MWh) = heat rate (Btu/kWh) ÷ 1000 · Fuel Cost ($/MWh) = fuel use × gas price · All-In Cost ($/MWh) = fuel cost + non-fuel cost · Annual Cost ($) = all-in × annual generation · Cost Change per $1/MMBtu ($/yr) = heat rate ÷ 1000 × annual generation · Break-Even Gas Price ($/MMBtu) = (grid price − non-fuel cost) ÷ fuel use

Gas price is the single biggest swing variable in behind-the-meter generation, so the sensitivity model holds everything else fixed and walks the fuel cost across a range of prices. Annual Generation (MWh) = Plant Capacity (MW) × 8,760 × Capacity Factor (%) ÷ 100. Fuel Use (MMBtu/MWh) = Heat Rate (Btu/kWh) ÷ 1,000, so an 8,500 Btu/kWh plant burns 8.5 MMBtu per MWh. Fuel Cost ($/MWh) = Fuel Use × Gas Price ($/MMBtu), and All-In Cost ($/MWh) = Fuel Cost + Non-Fuel Cost, where non-fuel cost bundles capital recovery plus fixed and variable O&M (about $32/MWh at the defaults, from the Behind-the-Meter Gas Plant LCOE Calculator). Annual Cost ($) = All-In Cost × Annual Generation. Two derived figures make the sensitivity actionable. Cost Change per $1/MMBtu ($/yr) = Heat Rate ÷ 1,000 × Annual Generation — at 8,500 Btu/kWh and 788,400 MWh that is 8.5 × 788,400 = $6.7 million per year for every dollar the gas price moves, which is why fuel price risk dominates behind-the-meter economics. Break-Even Gas Price ($/MMBtu) = (Grid Price − Non-Fuel Cost) ÷ Fuel Use — the gas price at which self-generation costs the same as buying grid power. At $80/MWh grid and $32/MWh non-fuel, that is (80 − 32) ÷ 8.5 = $5.65/MMBtu: below it, self-generation wins; above it, the grid is cheaper. The model uses a single annual average gas price — it does not capture intra-year volatility, seasonal swings, or hedging — and holds heat rate, capacity factor and non-fuel cost flat. Henry Hub is the US benchmark, but delivered prices add regional basis and transport. Data sources: US gas priced on higher heating value (HHV); typical heat rates 6,200–11,000 Btu/kWh by technology. Verification: 100 MW, 8,500 Btu/kWh, 90% CF, $4/MMBtu gas, $32/MWh non-fuel, $80/MWh grid → annual generation = 788,400 MWh, fuel use = 8.5 MMBtu/MWh, base fuel = $34/MWh, base all-in = $66/MWh, annual cost = $52.0M, cost per $1/MMBtu = $6.70M/yr, break-even gas = $5.65/MMBtu.

Used by: Gas Price Sensitivity Calculator

Spark spread & gas plant margin

Fuel Cost ($/MWh) = heat rate (Btu/kWh) ÷ 1000 × gas price ($/MMBtu) · Spark Spread ($/MWh) = power price − fuel cost · Margin ($/MWh) = spark spread − variable O&M · Break-Even Power Price = fuel cost + variable O&M · Annual Generation (MWh) = capacity × 8760 × CF ÷ 100 · Annual Energy Margin ($) = margin × annual generation · Margin per kW-year = annual margin ÷ (capacity × 1000)

The spark spread is the gross energy margin a gas plant earns selling one MWh of electricity: the power price it receives minus the fuel cost of generating it. Fuel Cost ($/MWh) = Heat Rate (Btu/kWh) ÷ 1,000 × Gas Price ($/MMBtu); dividing the heat rate by 1,000 converts Btu/kWh to MMBtu/MWh — the unit natural gas is sold in — so multiplying by the delivered gas price gives fuel cost per MWh directly. At 7,000 Btu/kWh and $4/MMBtu gas, that is 7 × 4 = $28/MWh. Spark Spread ($/MWh) = Power Price − Fuel Cost; at a $55/MWh power price, that is $55 − $28 = $27/MWh. Margin after Variable O&M ($/MWh) = Spark Spread − Variable O&M, where variable O&M covers the non-fuel costs that scale with generation (consumables, maintenance per running hour); at $3/MWh, the margin is $27 − $3 = $24/MWh. Break-Even Power Price ($/MWh) = Fuel Cost + Variable O&M — the power price at which the plant covers its fuel and variable costs but earns nothing toward fixed costs or profit; at $28 fuel and $3 variable O&M, that is $31/MWh, so the plant runs only when the power price is above $31. Annual Generation (MWh) = Plant Capacity (MW) × 8,760 × Capacity Factor (%) ÷ 100; at 500 MW and a 60% capacity factor, that is 2,628,000 MWh. Annual Energy Margin ($) = Margin after Variable O&M × Annual Generation — $24 × 2,628,000 = $63.07 million. Annual Margin per kW-year ($/kW-yr) = Annual Energy Margin ÷ (Capacity × 1,000), normalizing the margin against installed kilowatts — $63.07M ÷ 500,000 kW = $126.14/kW-year at the defaults, the figure a developer compares against fixed costs and capacity revenue to decide whether the plant earns its keep. US gas is priced on higher heating value (HHV), so HHV heat rates match how fuel is billed; lower heat rates burn less gas per MWh, widening the margin, which is why efficient combined-cycle plants stay in the money far more hours than simple-cycle peakers. This calculator covers energy margin only — it excludes start costs, carbon costs (the clean spark spread), and capacity revenue, all of which a full dispatch model adds. Data sources: US gas priced on higher heating value (HHV); typical heat rates 6,500-7,200 Btu/kWh combined-cycle, 9,000-11,000 Btu/kWh simple-cycle. Verification: 500 MW, 7,000 Btu/kWh, $4/MMBtu gas, $55/MWh power, $3/MWh variable O&M, 60% CF → fuel cost = $28/MWh, spark spread = $27/MWh, margin = $24/MWh, break-even = $31/MWh, annual generation = 2,628,000 MWh, annual margin = $63.07M, margin per kW-year = $126.14/kW-yr.

Used by: Spark Spread & Gas Plant Margin Calculator